0 Projects | Power-rite
  • Infrastructure

    Infrastructure

    Due to where the generators needed to be sited, J McCann approached Power-Rite for a solution. Power-Rite offered the ‘Powerbox’ c/w a ‘Gentrax’ tracker system which monitors the fuel, oil and coolant levels of the generator and also acts as a tracker device.

    More Info

  • Utilities

    Utilities

    Power-Rite had been contacted by Scottish Power as their current supplier could not provide a suitably sized diesel generator. The requirements were very specific, 15no 15kVA 3Phase generators, maximum weight 800kg

    More Info

  • Construction

    Construction

    Having a depot so close to the project at Crewe, Power-Rite was the obvious choice of suppliers. Carrying out a full electrical installation package, an Atlas Copco 500kVA silenced generator was supplied along with a 3000 litre bunded fuel tank

    More Info